nasma·ai
Agentic energy intelligence · Abu Dhabi

Your building over-cools.
Our agents get it back.

Nasma AI deploys autonomous AI agents on top of your existing HVAC and BMS — no new hardware — to cut cooling energy by 15–25%. Every dirham of savings is verified against an auditable baseline, and you only pay out of what we save.

FORECAST 41°C peak expected 14:40 · pre-cool window set 04:30–06:00 OPTIMIZER chiller-2 staged down 18% · comfort held at 23.5°C · est. AED 1,240 saved SENTINEL condenser fouling drift on AHU-7 · flagged 3 weeks pre-failure AUDITOR May savings verified vs IPMVP baseline · −21.6% kWh · report signed FORECAST 41°C peak expected 14:40 · pre-cool window set 04:30–06:00 OPTIMIZER chiller-2 staged down 18% · comfort held at 23.5°C · est. AED 1,240 saved SENTINEL condenser fouling drift on AHU-7 · flagged 3 weeks pre-failure AUDITOR May savings verified vs IPMVP baseline · −21.6% kWh · report signed
The problem

In the Gulf, over 70% of a building's electricity is cooling — and most of it runs blind.

STATIC SETPOINTS · REACTIVE MAINTENANCEFORECAST · OPTIMIZED · VERIFIED

District cooling reaches only ~15% of buildings. The rest — offices, malls, hotels, schools, warehouses — run standalone chillers on static schedules, overcooling against the afternoon heat and discovering equipment faults only when they fail in August. That gap is recoverable, and it's measured in dirhams, not promises.

How it works

A team of agents on your existing equipment

Forecast + Optimize

Cool ahead of the heat

Agents predict tomorrow's thermal load from weather, occupancy, and your building's history — then pre-cool during cheap, cool hours and stage chillers to the optimum, with comfort as a hard constraint.

Sentinel

Catch faults before August

Continuous watch on equipment telemetry detects efficiency drift, fouling, and failing components weeks early — ranked by what each fault costs you per month.

Auditor

Savings you can audit

Every kWh saved is verified against an IPMVP-aligned, weather-normalized baseline with a tamper-evident trail. No consultant PDFs — proof. It's also how we bill: a share of verified savings.

Deployment is read-only first. We connect via BACnet/Modbus or your BMS API and deliver insight within 30 days. Closed-loop control comes later, inside engineer-defined safety envelopes with human approval gates and full audit logs.

DAY 0 → CONNECT · DAY 30 → INSIGHT · DAY 90 → AUTOPILOT
Pilot programme · 2026

We're selecting five buildings in Abu Dhabi & Dubai.

If you own or manage a commercial building over 5,000 m² with a chiller plant, we'll run a zero-risk pilot: no hardware cost, no fee unless savings are verified. Facility-management companies welcome.

Talk to us hello@nasmaai.com